STIGhubSTIGhub
STIGsRMF ControlsCompare
STIGhub— A free STIG search and compliance tool·STIGs updated 3 days ago
Powered by Pylon·Privacy·Terms·© 2026 Beacon Cloud Solutions, Inc.
← CP-4 (4) — Contingency Plan Testing

CCI-000504

Definition

Include a full recovery and reconstitution of the system to a known state as part of contingency plan testing.

Parent Control

CP-4 (4)Contingency Plan TestingContingency Planning

Linked STIG Checks (3)

V-230185CAT IIA documented procedure is not available instructing how to load and dump the FEP NCP (Network Control Program).z/OS Front End Processor for ACF2 Security Technical Implementation GuideV-224485CAT IIA documented procedure is not available instructing how to load and dump the FEP NCP (Network Control Program).z/OS Front End Processor for RACF Security Technical Implementation GuideV-224722CAT IIA documented procedure is not available instructing how to load and dump the FEP NCP (Network Control Program).zOS Front End Processor for TSS Security Technical Implementation Guide