STIGhubSTIGhub
STIGsRMF ControlsCompare
STIGhub— A free STIG search and compliance tool·STIGs updated 3 days ago
Powered by Pylon·Privacy·Terms·© 2026 Beacon Cloud Solutions, Inc.
← Back to Traditional Security Checklist

V-245737

CAT II (Medium)

Protected Distribution System (PDS) Construction - Sealed Joints

Rule ID

SV-245737r1138404_rule

STIG

Traditional Security Checklist

Version

V2R8

CCIs

None

Discussion

A PDS that is not constructed and sealed as required could result in the undetected interception of classified information. Sealing of joints is necessary to ensure that daily visual inspections of the PDS for signs of attempted or actual intrusion can be accurately and thoroughly conducted. REFERENCES: CJCSI 6510.01F, INFORMATION ASSURANCE (IA) AND SUPPORT TO COMPUTER NETWORK DEFENSE (CND), Enclosure C, paragraph 35.c. 32 CFR 117 and 32 CFR 2001 and 2003 as well as DOD Manual 5220.32 Volume 1 DOD Manual 5200.01, Volume 3, 24 February 2012, SUBJECT: DOD Information Security Program: Protection of Classified Information, Encl 4, para 3.b. and 4.a. NIST Special Publication 800-53 (SP 800-53), Rev 4, Controls: PE-4, SC-7, and SC-8 CNSSI No. 7003, September 2015, Protected Distribution Systems (PDS), Section VIII, paragraph 26. and Section X, paragraph 30.a & b.

Check Content

Check to ensure:
 
1. All PDS seams and connectors are permanently sealed completely around all surfaces (e.g., welding (continuous or track), epoxy, fusion).
 
2. When a connection consists of more than one seam (e.g., a compression couple), then all seams must be sealed.
 
3. The seal provides a mechanical bond between the components of the carrier and are visible for inspection. 

4. Epoxy seals use a thick, opaque material.
 
5. Couplers that are secured with a "set screw" are not used.

6. If pull boxes are used during installation, check that the pull-box covers are secured/sealed to the pull boxes by welding or epoxy after installation.

7. If welded, at least one weld must be applied on each side of the box and cover.

8. If epoxy is used, it is applied between all mating surfaces continuously around the cover.
 
9. Painted surfaces are treated to form a mechanically strong epoxy bond.

10. Boxes with pre-punched knockouts are not used under any circumstances.

NOTE: If a pre-fabricated (Modular types such as Holocom or Wiremold) PDS is used it is also required to have all joints sealed as specified above.

Fix Text

1. All PDS seams and connectors must be permanently sealed completely around all surfaces (e.g., welding (continuous or track), epoxy, fusion). 

2. When a connection consists of more than one seam (e.g., a compression couple), then all seams must be sealed. 

3. The seal must provide a mechanical bond between the components of the carrier and are visible for inspection.
 
4. Epoxy seals must use a thick, opaque material.
 
5. Couplers that are secured with a "set screw" must not be used.

6. If pull boxes are used during installation, the pull-box covers must be secured/sealed to the pull boxes by welding or epoxy after installation.

7. If welded, at least one weld must be applied on each side of the box and cover.

8. If epoxy is used, it must be applied between all mating surfaces continuously around the cover. 

9. Painted surfaces must be treated to form a mechanically strong epoxy bond.

10. Boxes with pre-punched knockouts must not be used under any circumstances.

NOTE: If a pre-fabricated (Modular types such as Holocom or Wiremold) PDS is used it is also required to have all joints sealed as specified above.