STIGhubSTIGhub
STIGsRMF ControlsCompare
STIGhub— A free STIG search and compliance tool·STIGs updated 3 days ago
Powered by Pylon·Privacy·Terms·© 2026 Beacon Cloud Solutions, Inc.
← Back to Traditional Security Checklist

V-245742

CAT III (Low)

Protected Distribution System (PDS) Monitoring - Technical Inspections

Rule ID

SV-245742r1138409_rule

STIG

Traditional Security Checklist

Version

V2R8

CCIs

None

Discussion

A PDS that is not inspected, monitored and maintained as required could result in undetected access, sabotage or tampering of the unencrypted transmission lines. This could directly lead to the loss or compromise of classified. REFERENCES: CJCSI 6510.01F, INFORMATION ASSURANCE (IA) AND SUPPORT TO COMPUTER NETWORK DEFENSE (CND), Enclosure C, paragraph 35.c. 32 CFR 117 and 32 CFR 2001 and 2003 as well as DOD Manual 5220.32 Volume 1 DOD Manual 5200.01, Volume 3, 24 February 2012, SUBJECT: DOD Information Security Program: Protection of Classified Information, Encl 4, para 3.b. and 4.a. NIST Special Publication 800-53 (SP 800-53), Rev 4, Controls: PE-4, SC-7, SC-8, IR-4, IR-6, and PE-19 CNSSI No. 7003, September 2015, Protected Distribution Systems (PDS), Section XI, paragraph 34. and Table 4. PDS Technical Inspection Schedule.

Check Content

Check to ensure:
 
1. Technical inspections of PDS are conducted at least one or more times annually IAW Table 4. PDS Technical Inspection Schedule of the CNSSI 7003.
 
2. Checks and results must be documented and retained on file for a minimum of one year - or longer if required by the AO.

3. The person selected to accomplish the technical system inspection is trained to recognize changes in the technical aspects of PDS, e.g., by-pass circuitry, attachment or removal of devices or components, inappropriate or suspicious signal levels, and mechanical, TEMPEST, and RED/BLACK integrity of the PDS. If conducted by the CTTA this meets the requirement; otherwise, sufficient documented proof of training must be provided for the person conducting the inspection.
 
NOTE: This check is applicable within a tactical environment in a fixed facility but not applicable in a mobile field environment.

Fix Text

Correction of this finding can only be made by complete compliance with all the following CNSSI 7003 requirements:

1. Technical inspections of PDS must be conducted at least one or more times annually IAW Table 4. PDS Technical Inspection Schedule, of the CNSSI 7003.
 
2. Checks and results must be documented and retained on file for a minimum of one year - or longer if required by the AO.
 
3. The person selected to accomplish the technical system inspection must be trained to recognize changes in the technical aspects of PDS, e.g., by-pass circuitry, attachment or removal of devices or components, inappropriate or suspicious signal levels, and mechanical, TEMPEST, and RED/BLACK integrity of the PDS. If conducted by the CTTA this meets the requirement; otherwise, sufficient documented proof of training must be provided for the person conducting the inspection.
 
NOTE: This check is applicable within a tactical environment in a fixed facility but not applicable in a mobile field environment.